News

08.02.2019

SELF ELEVATED BARGES – GULF OF GUINEA

The new year of 2019 is synonymous with new challenges for PROCESS SYSTEMS and more widely for the IWF GROUP!   For the first time since its creation, PROCESS SYSTEMS has been commissioned to manufacture 6 self elevated barges measuring 18 meters by 18 meters with a height of 3.2…

EN SAVOIR +
27.07.2018

Performance test on TEG regeneration skid

NEW DEPARTURE !   FAT performed at our French Factory of a 12 m3/h TEG regeneration skid . This regeneration is equipped with an ultra-low NOx Gas Burner and will be installed on underground storage in the south west of France. Thank you to our client and to our team!

EN SAVOIR +
26.03.2018

Design and supply of Crude Oil Stripper unit for FPSO

Design and supply of Crude Oil Stripper unit for FPSO   Crude Oil Design Flow rate: 15 000 BOPD H2S inlet content: 10 000 ppmw Crude oil H2S outlet content: 20 ppmw Fuel oil H2S outlet content: 2 ppmw Stripper column: Diameter 850/2500 Height 12 m Total Package weight: 60…

EN SAVOIR +
22.03.2018

Design and supply of 2 stage electrostatic coalescers

Design and supply of 2 stage electrostatic coalescers (Crude oil Desalters) for FPSO:   Crude Oil Design Flow rate: 15 000 BOPD Inlet water soluble salt content: 210 g/l Outlet BS&W: 0.5% Outlet water soluble salt content: < 30 ptb (85 mg/l) 2 transformers (100 kVA) for each electrostatic coalescer…

EN SAVOIR +