Archives

27.07.2018

Performance test on TEG regeneration skid

NEW DEPARTURE !   FAT performed at our French Factory of a 12 m3/h TEG regeneration skid . This regeneration is equipped with an ultra-low NOx Gas Burner and will be installed on underground storage in the south west of France. Thank you to our client and to our team!

EN SAVOIR +
26.03.2018

Design and supply of Crude Oil Stripper unit for FPSO

Design and supply of Crude Oil Stripper unit for FPSO   Crude Oil Design Flow rate: 15 000 BOPD H2S inlet content: 10 000 ppmw Crude oil H2S outlet content: 20 ppmw Fuel oil H2S outlet content: 2 ppmw Stripper column: Diameter 850/2500 Height 12 m Total Package weight: 60…

EN SAVOIR +
22.03.2018

Design and supply of 2 stage electrostatic coalescers

Design and supply of 2 stage electrostatic coalescers (Crude oil Desalters) for FPSO:   Crude Oil Design Flow rate: 15 000 BOPD Inlet water soluble salt content: 210 g/l Outlet BS&W: 0.5% Outlet water soluble salt content: < 30 ptb (85 mg/l) 2 transformers (100 kVA) for each electrostatic coalescer…

EN SAVOIR +
07.03.2018

NAPEC 2018 – MARCH 25-28 – ORAN, ALGERIA

Meet all PROCESS SYSTEMS team at the NAPEC show from 25 to 28 March 2018, in Oran – Algeria NAPEC MEETING : 4 key days to meet all operators, and all suppliers of products and services in the oil and gas sector. The opportunity for you to discuss your future…

EN SAVOIR +
07.02.2018

Crude oil // 3 skids on a FPSO

New departure of 3 crude oil processing skids to be installed on a FPSO in Congo. Crude/Crude heat exchangers skid Produced water treatment skid Flare KO Drum skid    

EN SAVOIR +
12.01.2018

Started-up a TEG reclaiming unit

  Process Systems engineers have just started-up a TEG reclaiming unit in the south of Algeria. This unit is designed to remove contaminants (Salt and hydrocarbon liquids) from TEG. Thank you to our client and to the Process Systems guys for this mission.

EN SAVOIR +