News

04.11.2020

CONTINUITY FOR PROCESS SYSTEMS

Like many economic actors, PROCESS SYSTEMS has had to overcome the health crisis linked to the COVID-19 pandemic. Following a brief adaptation period whilst ensuring the employees’ safety, everyone has had to find their bearings working from home thus enabling each project to proceed smoothly. Today all our employees have…

EN SAVOIR +
04.11.2020

STORENGY’S HSE CHALLENGE – Communication category

PROCESS SYSTEMS recently participated in the HSE Challenge organised by STORENGY, winning 3rd place in the Communication category (out of 22 applicants), submitting a tool which enables/promotes a better management of the coactivity on site. This tool was tested on site for the revamping of 3 TEG regeneration units on…

EN SAVOIR +
03.06.2019

Design and supply of electrostatic coalescers

Design and supply of electrostatic coalescers (Crude oil Desalters) for refinery: Crude Oil Design Flow rate: 50 000 BOPD Outlet BS&W: 0.1% Salt content of treated crude: < 5 ppm W 2 transformers (100 kVA) for each electrostatic coalescer (2 x 100%) 2 Desalters 3400 mm diameter / 16 400…

EN SAVOIR +
08.02.2019

SELF ELEVATED BARGES – GULF OF GUINEA

The new year of 2019 is synonymous with new challenges for PROCESS SYSTEMS and more widely for the IWF GROUP!   For the first time since its creation, PROCESS SYSTEMS has been commissioned to manufacture 6 self elevated barges measuring 18 meters by 18 meters with a height of 3.2…

EN SAVOIR +