Pig traps for gas – Hassi R’mel
Pig launcher skid 54″ x 48″ 600# for gas pipeline
EN SAVOIR +Pig launcher skid 54″ x 48″ 600# for gas pipeline
EN SAVOIR +4 Pigs launcher skid 46″ x 40″ 600# for gas pipeline 3 Pigs receiver skid 44″ x 40″ 600# gas pipeline
EN SAVOIR +Gas station for fuel supply of gas turbines for combined cycle power plant 3*400 MW Gas flowrate : 180 000 Nm3/h at 70 barg.
EN SAVOIR +Supply of fiscal metering system for the pipeline departure terminal RGZ1. Six 16″ 600# metering lines with orifices fittings. Gas flowrate : 2 100 000 Nm3/h at 70 barg.
EN SAVOIR +Amine removal project for liquéfaction train 05P and 06P of the GL-1/K complex. Installation of structured packing in a decarbonisation tower and filtering system of gas and amine circuit. EPC contract. Gas flowrate: 245 000 Nm3/h at 42 barg.
EN SAVOIR +Glycol reclaiming unit. TEG flowrate : 5 400 kg/h at 200 mbara.
EN SAVOIR +4 Pigs launcher 28″ x 24″ 600# for LPG pipeline 4 Pigs receiver 28″ x 24″ 600# for LPG pipeline 1 Pig launcher 24″ x 20″ 600# for LPG pipeline 1 Pig receiver 24″ x 20″ 600# for LPG pipeline 1 Pig receiver 10″ x 6″ 600# for LPG pipeline
EN SAVOIR +4 gas conditionning skids Gas flowrate: 36 000 Nm3/h at 70/45/4 barg Gas flowrate: 25 000 Nm3/h at 70/7 barg Gas flowrate: 25 000 Nm3/h at 70/4 barg Gas flowrate: 20 000 Nm3/h at 70/5 barg
EN SAVOIR +Slug catcher and separator for HASSI BERKINE’s power plant. Gas flowrate : 160 000 Nm3/h at 57 bar g.
EN SAVOIR +Natural gas analysis shelter of water and hydrocarbon dew-points in the fiscal metering sector at Departure terminal GZ4 CNDG.
EN SAVOIR +