News
29.09.2021

300 TONNES TOWARDS SOUTHERN ALGERIA

Following the engineering and manufacturing phases, 300 tonnes of process equipment was transported from France to Southern Algeria. PROCESS SYSTEMS delivered a 40,000 BOPD two-stage desalter package completely assembled and tested in the workshop.

300 TONNES SUD ALGERIEN PROCESS SYSTEMS
300 TONNES SUD ALGERIEN PROCESS SYSTEMS
300 TONNES SUD ALGERIEN PROCESS SYSTEMS
300 TONNES SUD ALGERIEN PROCESS SYSTEMS